Urban Design of Waterfront Area (4): Integrated design of TOD project in the third batch of 5 bid sections of Chengdu Rail Real Estate Group

New Work Chongqing Branch

 

An era opportunity for urban transformation

Chengdu is building a national central city that fully embodies the new development concept, and vigorously promotes TOD integrated urban design. In what manner will the Pidu District, whose administrative status has been elevated, join the wave of urban development and reform in Chengdu?

This case, located in the western district of Pidu, has the advantages of scarce subways and high-speed railways. It is bound to become an important witness, participant, and even leader of this urban transformation.

 

Truly integrated design from the top

The project is located in the West District of Pidu, and the design scope includes a subway station (Yangliushu Station) and a depot (Pitong Depot).

 

The superstructure development project of the subway depot is different from ordinary urban development projects. The successful realization of the field-city integration requires as much as possible to consider the feasibility of the project from the conceptual planning stage to overcome the technical problems related to integrated design and construction. At the same time, it is necessary to continuously coordinate the demands and goals of different stakeholders.

 


▲Schematic diagram of project location

 

Therefore, Zhubo Design Co., Ltd. cooperated with Lin Tongyu International Engineering Consulting Co., Ltd. and DTZ to carry out the design. The project is based on macroeconomic planning, project positioning first, overall planning and design, architectural design, landscape design, rail engineering, municipal engineering, transportation design, structural engineering and ecological planning and other professional collaborations, and strive to ensure the development of the upper cover of the subway depot and the underground The site development layout meets the structural and engineering requirements of the section track and functional buildings, and minimizes the potential impact and risk of the subway station and depot operations on the upper and lower platform properties and the surrounding urban space.

 

Realize the integrated design of the space category, the integrated design of cross-professional collaboration, and the integrated design of the whole design cycle.

 


▲General floor plan

 

The three major strategic significance of the research project to the city

▎Form a new model of integrated comprehensive development of TOD in the suburbs of cities

The project site is the second site of Metro Line 6, and is a typical suburban site with immature surrounding development conditions. Different from the traditional TOD development model that first activates the site and then radiates the surrounding area, this plan adopts the idea of ​​"connecting and cultivating first, then activating radiation" to plan and design this project. In the early stage, the construction of the open and covered park and the Pidu West Station, surrounding culture, and ecological resources will be the main focus to cultivate a vibrant urban center. Later, the site value will be released, the TOD development value will be strengthened, and the engine project leading the development of Pidu West will be gradually formed. Form a new model of integrated comprehensive development of TOD in the suburbs of cities.

 


▲Overall bird's eye view

 

▎Build a new image of Pidu from "tourist destination" to "suburban tourist destination"

Although Pidu is located on the must-travel route from Chengdu to Capital-Qingdao, it lacks high-quality tourism carriers and cannot enjoy the tourist bonus of nearly tens of millions of tourists. It is more of a role as a tourist destination. In planning, we integrated the 4A scenic spot Wangcong Temple Cultural Industry Park, the city-level greenway park Tuojiang River Park and the urban industrial cultural characteristics to build an integrated one, and build "Ancient Shu Culture-Traditional Culture-Modern Science and Technology Culture" as the story line The immersive experience park forms an important cultural and tourist destination in the suburbs of Chengdu. Realize the key role transformation of Pidu from "tourist destination" to "suburban tourist destination".

 


▲Overall bird's eye view

 

▎Create a new Pixi comprehensive service center from the "edge zone" to the "convergence node"

Based on the TOD development model of subway stations, the development of the upper cover of the linked depot will bring opportunities for rebirth and rejuvenation of the depot in the city's marginalized area. High-density development has stimulated a high degree of integration of commercial, commercial, cultural, residential and recreational functions. Through the open sky corridor, the existing Wangcong cultural resources, Tuojiang ecological resources, and outlet commercial service resources around the site are connected in series. The advantages of clustering are more prominent, forming a complete one-stop service complex, and truly The "marginal zone" moves towards the "integrated node" of the new comprehensive service center in Pixi.

 


▲A bird's-eye view of the night scene

 

Explore the difficulties and strategies of project planning

▎Enhance economic value

First of all, to deal with the problems that the site value coverage radius is occupied by the depot, the high value of the land cannot be released, the prior design and construction of the track operation station did not reserve enough load, and the land plot output is insufficient. Intensity, increase land output and reduce the pressure on rail construction funds.

 

 

▎Promote collaborative development

Secondly, the surrounding advantageous resources are in a relatively independent state of development and lack of contact with each other. The plan is to build and connect with the surroundings from the three dimensions of transportation coordination, cultural coordination, and public service coordination, and strengthen the overall cluster effect.

 

 

▎Alleviate urban fragmentation

In addition, the rail car depot is more than ten meters above the ground vertically, causing the city to split. It is designed to set up rhythmic aerial corridors at different elevations to establish a connection between the north and the south. In terms of landscape, the design of covering the park's green gentle slope combined with the rhythmic building skin softens the cold and uninteresting vertical facade of the depot.

 

 

▎Ensure resource sharing

Finally, the plan is to enhance the accessibility of public resources and waterfront vitality of Tuojiang River, and to cover the interconnection and interaction of public space and urban waterfront landscape to avoid the privatization of public resources.

 

 

Present the project form and blueprint

▎Functional image×a smartly developed TOD metro new city

The project deeply implements the circle-layer layout model of the TOD concept, reasonably determines and moderately increases the development intensity of the TOD core area, intensively utilizes land resources, and promotes the integrated development of rail transit and urban functions.

 


▲Perspective view of portal landmarks

 

▎Cultural ecology×a park city with diverse ecology

We are well versed in the role of parks in cities, and we fully implement the concept of Chengdu Park City to achieve a high degree of harmony and unity of people, city, environment and industry. On the macro level, it fully connects with the surrounding park system, on the meso level it is open and covered with parks, and on the micro level, parks of different scales, elevations and different themes are constructed.

 


▲Covered with a perspective view of the park’s day view

 


▲Covered with a perspective view of the park at dusk

 

▎Transportation connection × a three-dimensional city of intercommunication and integration

The return project is the essence of a transportation hub, from the four levels of regional arrival, site collaboration, TOD-centric conversion, and characteristic tour experience, to fully implement the concept of an interoperable and integrated city.

 


▲Perspective view of sky corridor

 

The exploration of human settlements in the era of stock

The integrated design of the TOD project in the third batch of 5 bid sections (Yangliushu Station, Pitong Depot) is not only a landmark leading product of the urban development of Pidu, but also an attempt to build a community with the depot. It is an exploration of advanced community construction concepts such as "open communities" and "park cities". In an era when urban development has gradually moved from incremental planning to stock planning, the development and utilization of the area above the depot is more urgent and necessary. Focusing on people-oriented needs and creating a humane community has always been the goal of Zhubo Design. The planning of this project is another important exploration of Zhubo in the construction of the residential community.

 


▲A bird's-eye view of the double railway at night

 

Tuochuan water port connects river and land,
Pidu Shuangtie overlooks the homeland,
A force leading the development and reform of Pidu city is gaining momentum.

 

Project information

Design company: Zhubo Design Co., Ltd.
Project address: Pidu District, Chengdu
Land area: 470,000 square meters
Building area above ground: 500,000 square meters
Underground construction area: 140,000 square meters
Design year: 2018
Project status: Design completed
Project owner: Chengdu Railway Real Estate Group
Chief Architect of the Project: Wang Yi
Project Chief Planner: Li Tao
Project General Counsel: Xu Changjun
Project designers: Zhang Huawei, Liang Pu, Zhou Hua, Shu Chang, Hu Xin, Pan Luo, Mu Guiming, Zhou Meilin, Yi Qin, Deng Yujie
Cooperative units: Lin Tongpi International Engineering Consulting Co., Ltd., DTZ


Warning: mysqli_query(): (HY000/1030): Got error 28 from storage engine in /home/www/zhubo/http/library/cls_mysql.php on line 56
Sql exception: Got error 28 from storage engine in SQL: SELECT a.*,c.rootid AS cate_rootid,c.name as cate_name,c.name_cn as cate_name_cn,c.parentid as parentid,c.image1 as cate_image1,c.ext_1 as cate_ext_1,c.my_url as cmy_url FROM suma_articles as a LEFT JOIN suma_categorys as c ON a.pid=c.id WHERE a.site='en' AND pid = 51 AND a.id != 518 AND a.display = 1 ORDER BY RAND() limit 0, 4